NPDC Flow station relocation & upgrade, Oredo, Nigeria.

Baywood Continental Ltd., Nigeria.

Detail engineering (Process, Mechanical, Piping, Instruments, Civil, Hazop Study etc.) for increasing the capacity up to 10,000 BOPD crude oil and 60 mmscfd of gas, Technical assistance, Training, Witnessing of FAT.

COMPLETED

Turn-Around Maintenance and Rehabilitation Projects at Port Harcourt Refining Company Limited.

Chrome Consortium.

Maintenance and repairs of static equipment (reactors, columns, drums, vessels, heat exchangers, flare, piping, valves) in Areas 1, 2 and 3 and civil works at Port Harcourt Refining Company Ltd.

COMPLETED

Rehabilitation of FCC Regenerator Air Grid in Port Harcourt Refining Company.

Chrome Consortium

Engineering and design, procurement and expediting, dismantling of old air grid and flue gas line, execution of 90” window in reactor’s shell, installation of new air grid and flue gas line, closing by welding of window, refractory works, civil works.

COMPLETED

Rehabilitation of Power Plant Steam Boilers 70 B02 & 70 B03 at Port Harcourt Refining Company.

Chrome Consortium.

For each boiler, dismantling of boiler casing, removal of air ducts and piping, insulation and refractory, pressure test and inspection, dismantling of headers, removal of superheaters, installation of new ones, dismantling of vaporizing banks panels and damaged tubes, extraction of tubes ends from vaporizer drums, preparation of drums bores for expansion, installation and expansion of new tubes, pressure test, installation of air ducts and piping, restoration of metallic structures, and casing, installation of internals inside steam drum, installation of burners, boxing-up of boiler, civil works.

COMPLETED