CONSTRUCTION OF KADUNA-JOS 330KV D/C TRANSMISSION LINE

TRANSMISSION COMPANY OF NIGERIA (TCN)

Engineering, Procurement and Construction of 330kV Double Circuit Transmission Line

ON GOING

CONSTRUCTION OF DAMATURU - GASHUA 132KV D/C TRANSMISSION LINE

TRANSMISSION COMPANY OF NIGERIA (TCN)

ON GOING

Construction of 132KV Double Circuit Transmission Line OKPAI - KWALE

TRANSMISSION COMPANY OF NIGERIA (TCN)

Engineering, procurement and Construction of 132kV Double Circuit Transmission line from Okpai - Kwale

ON GOING

EMERGENCY REPAIR OF COLLAPSED 330KV SC OSHOGBO-JEBBA TRANSMISSION LINES

TRANSMISSION COMPANY OF NIGERIA (TCN)

Engineering, procurement and Construction of Reconstruction of Collapsed Tower 3Nos pn Jebba - Osogbo 330kV SC OTHL

ON GOING

DISTRIBUTION PROJECT LOT D-EPC-JS-YL4-30, JOS-YOLA DISTRUBUTION ZONE

NATIONAL INTEGRATED POWER PROJECT

Construction of 1X7.5MVA 33/11kV injection substation at Jalingo town, (jalingo Business unit within Yola Distribution Zone) completed the following:
- 0.16km 33kV line
- 11kV feeders with total route length of 26.45km complete with HVDS cluster of 120No of 11/0.415kV CSP Transformers

COMPLETED

CONSTRUCTION OF LOT 19-4, BENIN NORTH-OKADA 132 KV D/C TRANSMISSION LINE

NATIONAL INTEGRATED POWER PROJECT

Engineering, Procurement and Construction of 132kv Benin North-Okada DC Transmission Line

COMPLETED

CONSTRUCTION OF LOT 16-2, ERUKAN-EGBIN/IKEJA-WEST 330 KV D/C TRANSMISSION LINE

NATIONAL INTEGRATED POWER PROJECT

Transmission Line - 330kv Turn in turn out dc oke aro-egbin/ikeja west T/L

COMPLETED

CONSTRUCTION OF PAPALANTO - IKEJA WEST 330 KV D/C TRANSMISSION LINE

TRANSMISSION COMPANY OF NIGERIA (TCN)

Design, manufacture, supply, construction and commissioning of the following permanent plant and equipment:
- 330kV Double circuit overhead transmission line with circuit identiication number T1W and T2A on 38 No. galvanized steel lattice towers with ACSR "Bison" conductors - 2 No. conductors per phase, 1 No. overhead Optic Fiber Ground Wire (OPGW) and 1 No. overhead galvanized earthwire.
-The towers are erected with anti-vandal bolts/nuts upto bottom crossarm.

COMPLETED

CONSTRUCTION OF GOMBE-YOLA-JALINGO 330 KV S/C TRANSMISSION LINE

CHROME CONSORTIUM ENERGY, Beneficiary POWER HOLDING COMPANY OF NIGERIA Plc.

Design, maufacture, supply, construction and commissioning of the following permanent plant and equipment of the Gombe -Ngurore 330kV S/C line of 198.209km length.
- 330kV Single circuit overhead transmission line with circuit number E2Y on 596 No. galvanized steel lattice towers with ACSR 'Bison' conductor. 2No. conductors per phase, 1No. of overhead Optic Fibre Ground Wire (OPGW) and 1No. overhead galvanized earthwire.
- The towers are erected with anti-vandal bolts/nuts.
- The foundations are of pad and chimney type.

COMPLETED

SUPPLY AND CONSTRUCTION OF 2ND CIRCUIT 330KV TRANSMISSION LINE SINGLE CIRCUIT BENIN - ONITSHA

POWER HOLDING COMPANY OF NIGERIA Plc.

Comprising: Design, manufacture, supply, test, delivery to site and the installation of all materials and equipment needed and commissioning of 330kV single circuit transmission line of approximately 131km in length, from the existing Benin Main 330/132kV Substation to the existing Onitsha 330/132kV Substation

COMPLETED

CONSTRUCTION OF SINGLE CIRCUIT AKURE-ADO EKITI 132 KV (47KM) AND 5KM DOUBLE CIRCUIT TRANSMISSION LINES

POWER HOLDING COMPANY OF NIGERIA Plc.

Erection and Commissioning 47km of 132kV Single Circuit Transmission Line and the design, manufacture, supply, delivery to site, installation of all materials and equipment needed for the execution of the electromechanical works and commisioning of 5km Double Circuit 132kV Transmission Line.

COMPLETED

RE-ROURING OF PAPALANO - ABEOKUTA 132KV SC AND IKEJA WEST - AYEDE 330KV SC LINES AT OWIWI DAM SITE

GILMOR ENGINRRTING (NIGERIA) LIMITED

Design, manufacture, supply, construction, erection and commisioning of all equipment, materials and works in respect of:
a) Re-routing of Ikeja West-Ayede 330kV Single Circuit Transmission Line at Owiwi Dam Project Site, Ogun State from Tower 400-405; approximately 2.8km long.
b) Re-routing of Papalanto- Abeokuta 132kV Single Circuit Transmission Line also at above Dam Project Site, form Tower 67-75; approximately 2.8km long.

COMPLETED

Construction of 132KV Double Circuit Transmission Line Kainji - New Bussa with 330KV S/C River Crossing at Kainji

TRANSMISSION COMPANY OF NIGERIA (TCN)

Manufacture, supply, Delivery to site, Erection, installation of all Materials and Equipment needed for the realization and commissioning of the project.

COMPLETED

REHABILITATION OF SOKOTO-TALATA MAFARA - GUSAU 132KV S/C TRANSMISSION LINE

TRANSMISSION COMPANY OF NIGERIA (TCN)

Complete rehabilitation of Gusau-Talata Mafara 132kV single circuit transmission lines comprising 756 S/C towers, 20D/C towers and 1No. special connecting tower. All the glass disc insulators are replaced with composite insulators on all towes and other associated rehabilitation works.

COMPLETED

Construction of 330kv TL Terminal In & Out of the 330kV substation gantry at Asaba.

NATIONAL INTEGRATED POWER PROJECT

For Engineering procurement and construction of turn-in and turn-out towers with foundation, hardware and stringing to the substation gantries and to the entire transmission line onitsha-benin north 330kV, single circuit.

COMPLETED